Phase II Stormwater Management Logo



SITE MAP

Home

What is Phase II

Who is Affected

What is a small MS4
Fact Sheet 2.1
Fact Sheet 2.2

What Are the Phase II Small MS4 Program Requirements?


Six minimum measures

Public Education and Outreach

Public participation

Illicit Discharge Detection and Elimination

Construction Site Runoff Control

Post-Construction Runoff Control

Pollution Prevention/Good Housekeeping


State Implementing Rules

North Carolina NPDES Phase II Temporary Rule Text (pdf)

North Carolina's NPDES Phase II Stormwater permanent rule-making process


Educational Tools

Downloadable Presentations

Letters


Maps

NC River Basin Map

NC Basinwide Planning Maps (Thumbnail Links)

NC Urban Areas

Other NC DENR Maps


Federal Rules and Factsheets

Federal Rule Language

Permitting and Reporting

Small Construction

Construction Rainfall Erosivity Waiver

No Exposure Exclusion


Funding sources

General Funding Sources


Questions Not Answered Here


Contact:
NCDENR Stormwater and General Permits Unit: (919)733-5083


Some documents require Acrobat Reader 5.0 or later

Get Adobe Reader


Site made available through the cooperation of the following organizations:


NC Division of Water Quality

Northwest Piedmont Council of Governments

Land-of-Sky Regional Council

Upper Coastal Plains Council of Governments

Western Piedmont Council of Governments


Illicit Discharge

Detection and Elimination


Developing and implementing a plan to detect and eliminate illicit discharges to the storm sewer system (includes developing a system map and informing the community about hazards associated with illegal discharges and improper disposal of waste).


Description/Goals and Objectives

EPA Requirements/Guidance

EPA

Fact Sheet with Regulations, Guidance, and Best Management Practices

EPA

Minimum Measure Fact Sheet


NC DWQ Requirements/Guidance

EMC Temporary Rules
For the specific EMC rules on addressing the Illicit Discharge Detection and Elimination Measure, go to Sub-item 7. (a)(iii) within the Temporary Phase II Rules.

DWQ Instructions
For DWQ instructions on addressing the Illicit Discharge Detection and Elimination Measure, go to Section 7.3 of the Instructions for Preparing the Comprehensive Stormwater Management Program Report.



Resources to Implement

Model/Sample Programs

NC Model Illicit Connection Ordinance

Stormwater Manager's Resource Center - Model and Sample Ordinances

Town of Cary Illicit Discharge Elimination Plan

EPA
Model Ordinances to Protect Local Resources Contains copies of local ordinances including sediment and erosion control, post construction runoff controls, illicit discharges and buffers.


Resource Persons/Agencies

Colleges/Volunteer Groups for Outfall Mapping County Health Departments
Citizen Monitoring Programs DENR for Chemical/Biological Monitoring (see Basin Plans)

Links to websites/documents/agencies

EPA Illicit Discharge Detection and Elimination Guidance Doc.




| Home | Six Minimum Measures | What is Phase II? | Disclaimer | NC Division of Water Quality |