Phase II Stormwater Management Logo



SITE MAP

Home

What is Phase II

Who is Affected

What is a small MS4
Fact Sheet 2.1
Fact Sheet 2.2

What Are the Phase II Small MS4 Program Requirements?


Six minimum measures

Public Education and Outreach

Public participation

Illicit Discharge Detection and Elimination

Construction Site Runoff Control

Post-Construction Runoff Control

Pollution Prevention/Good Housekeeping


State Implementing Rules

North Carolina NPDES Phase II Temporary Rule Text (pdf)

North Carolina's NPDES Phase II Stormwater permanent rule-making process


Educational Tools

Downloadable Presentations

Letters


Maps

NC River Basin Map

NC Basinwide Planning Maps (Thumbnail Links)

NC Urban Areas

Other NC DENR Maps


Federal Rules and Factsheets

Federal Rule Language

Permitting and Reporting

Small Construction

Construction Rainfall Erosivity Waiver

No Exposure Exclusion


Funding sources

General Funding Sources


Questions Not Answered Here


Contact:
NCDENR Stormwater and General Permits Unit: (919)733-5083


Some documents require Acrobat Reader 5.0 or later

Get Adobe Reader


Site made available through the cooperation of the following organizations:


NC Division of Water Quality

Northwest Piedmont Council of Governments

Land-of-Sky Regional Council

Upper Coastal Plains Council of Governments

Western Piedmont Council of Governments



Construction Site Runoff Control


Developing, implementing, and enforcing an erosion and sediment control program for construction activities that disturb one or more acres of land (controls could include silt fences and temporary storm water detention ponds).

Picture of silt fence as control mechanism



Description/Goals and Objectives

EPA Requirements/Guidance

EPA
Fact Sheet with Regulations, Guidance
and Best Management Practices (BMP's)

EPA
Minimum Measure Fact Sheet


NC DWQ Requirements/Guidance

EMC Temporary Rules
For the specific EMC rules on addressing the Construction Site Storm water Runoff Control Measure, go to Sub-item 7. (a)(iv) within the Temporary Phase II Rules

DWQ Instructions
For DWQ instructions on addressing the Construction Site Storm water Runoff Control Measure, go to Section 7.4 of the Instructions for Preparing the Comprehensive Storm water Management Program Report

DWQ General Permit
For the DWQ General Permit for Point Source Discharges from Construction Activities



Resources to Implement

Model/Sample Programs

Local Erosion and Sedimentation Control Programs in NC

Model Local Erosion and Sedimentation Control Ordinance (NC Land Quality Section) Being Updated - Contact the Section at 919-733-4574



Resource Persons/Agencies

NC Division of Land Resources
Land Quality Section

Local Erosion and Sediment Control Programs

Clear Water Contractors Workshops

1-866-STOPMUD Hotline
(1-866-786-7683)

North Carolina State University
Department of Soil Sciences Training,
Short Courses, and Workshops

North Carolina State University
Soil and Water Environmental
Technology Center

Orange County, NC
Erosion Control Division

Erosion Patrol Materials
(3rd grade)



Potential Funding Sources

Sedimentation Control Commission Education Program Grants

NC Clean Water Management
Trust Fund



Links to websites/documents/agencies

HWA “It’s Not Just Dirt” Fact Sheet

Department of Land Resources Publications
Manuals, Brochures, Videos, etc.

The Center for Watershed Protection
The Stormwater Manager's Resource Center



| Home | Six Minimum Measures | What is Phase II? | Disclaimer | NC Division of Water Quality |